(Tender Bid II) Announcement of Tender for Reinforcement Project of Seawall of Fujian Datang International Ningde Power Generation Co., Ltd.

(Tender Bid II) Announcement of Tender for Reinforcement Project of Seawall of Fujian Datang International Ningde Power Generation Co., Ltd.

In accordance with the Law of the People’s Republic of China on Tendering and Bidding, the Regulations on the Implementation of the Tender and Bidding Law of the People’s Republic of China, and relevant laws and regulations, the principles of openness, fairness, impartiality, and good faith were entrusted by Fujian Datang International Ningde Power Generation Co., Ltd. As for the domestic public bidding for the seawall reinforcement and reinforcement project of Fujian Datang International Ningde Power Generation Co., Ltd., the units that meet the qualification requirements are welcome to participate.

I. Project Description:

Fujian Datang Ningde Power Plant is located in the south of Longzhu Village, Wanwu Town, Fu'an, Ningde City, Fujian Province. The power plant has a total of 4 generating units, including a 2×600MW domestic coal-fired unit (3#, 4#) and Phase 2 2×660MW. Coal-fired units (1#, 2#) were completed and put into operation in 2006. The second phase of the project was put into operation in 2008. The installed capacity of the second phase was: 2520MW. It was built by Beijing Power Construction and Fujian Power Construction respectively. The institute is responsible for the main design, and Guangdong Tianan Supervision Company carries out construction supervision. The seawall project of the plant was completed in October 2006. It has a total length of 1.887km. The starting point at the southern end begins at the shoulder of the Lower Huashan Mountain on the south side of the site, and the north end meets the grey dyke through the transition section. Seawall began construction in April 2004 and was completed by October 2006. After 10 years of operation, the east-west dyke was covered by a dyke on the north side, and was affected by the wind and waves. The settlement was small and basically remained intact. Can meet the original design moisture standards. The north-south-to-sea embankment foundation of the main power plant of the power plant is a soft foundation, due to the uneven settlement of the embankment, the elevation of the embankment, the leakage of the local embankment, the shedding of the external slope-blocking stone, and other conditions, the original design embankment The elevation is 6.5m. The measured embankment elevation is 5.52-6.50m. The embankment elevation of most embankments is lower than that of the original designed embankment. The embankment can no longer meet the original design standards for moisture protection. There are potential safety hazards, especially during the typhoon tide. The safety of people and equipment in the embankment is severely affected. To this end, the plant is diverted from the north to the south to the sea embankment for reinforcement.

Second, the scope of the tender:

This tender is the reinforcement project for the seawall section of the plant, which has a length of 1.887km. The construction drawings for the reinforcement of the danger have been designed and completed by the Fujian Water Conservancy and Hydropower Design Institute. (See the attached electronic version). The scope of the tender for this project is composed of three parts: The first part is the seawall embankment heightening project, which divides the original block masonry stone removal; stone slag filling; gravel cushion; C25 concrete embankment cover; C25 concrete protection Shoulder; C30 concrete retaining wall and the corresponding expansion joints and other projects. The second part is the seawall embankment protection project, divided into C25 concrete shoulder; C25 concrete foot protection; C25 box beam girder; C30 concrete four-foot hollow block slope; expansion joints and other projects. The third part: seawall anti-seepage project, subdivision slope cleaning; silt filling; surface covering and turf slope protection and other projects. The specific work content shall be based on the final record of the bidding documents.

Third, the bidder's qualification requirements:

The bidder shall have the ability to perform the contract satisfactorily and shall meet the following conditions:

3.1 It has the legal personality and the ability and power to independently conclude and perform the contract. The registered capital is not less than RMB 20 million.

3.2 valid business license, organization code certificate, tax registration certificate.

3.3 Professional technicians, equipment and facilities in construction, quality control, etc., with ISO9000 series or equivalent quality assurance System certification and annual inspection records.

3.4 It has one level of general contracting for water conservancy and hydropower construction, or more than grade one qualification for professional contracting of embankment engineering.

3.5 In the past five years, the performance of a similar seawall project has not less than two and the running time is not less than two years, providing user certification documents.

3.6 Has good bank credit and business reputation, is not being ordered to suspend business or bankruptcy, and assets have not been reorganized, taken over and frozen. Audited financial statements for the past three years.

3.7 In the construction of engineering projects undertaken by the China Datang Corporation in the past, there were no technical, quality or commercial disputes involving the main responsibility of the bidders.

3.8 Provide qualifications (photocopy) and construction performance of project managers and key technicians of this project.

3.9 The Commonwealth does not accept bids for this consortium.

Fourth, the tender documents obtained:

4.1 Ways to Obtain Bidding Documents: Log in, apply for the bidding document with the company's CA certificate electronic key and follow-up bids.

4.2 Bidding documents are issued: From 15 November 2016 to 17:00 pm on November 25, 2016, overdue deadlines will not be accepted. (The bid fee must be wired by the company's account, otherwise the invoice for the bid cannot be issued.)

Note: According to relevant national laws and regulations, as of October 1, 2016, bid security and bidding fees must be paid by the bidders participating in the bidding of the project in the name of the company's public account, and will not accept the payment of bid security in the name of the individual. The bidding fee shall not be paid in other units or in the name of the individual.

2) The result of the purchase is subject to the platform.

4.3 After the tender has adopted the post-qualification method, the bid evaluation committee will review the qualifications of the bidders after the bid opening. The bidders' bids that do not meet the requirements of the tender notice will be treated as rejected bids.

V. Submission of tender documents:

5.1 Deadline for Submitting Bidding Documents (Bid Deadline, the same below): At 10:00 am on December 6, 2016 (to be announced).

5.2 Place of delivery: Beijing (to be notified)

5.3 Ways of submission: Prior to the deadline for submitting tender documents, potential bidders submitted paper tender documents and their electronic versions according to the requirements of the tender documents, and completed the electronic uploading and uploading of electronic tender documents on e-commerce platforms. Written documents submitted late or not delivered to designated locations or not sealed as required will not be accepted by the tenderee.

5.4 Other submission methods and issues requiring attention: The electronic version of the bidding documents needs to be submitted on the platform, and the electronic opening and evaluation of bids shall be implemented. Do not open the bidder's written bid documents, sing the target, only for archiving use.

Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

USB Charging

ES820 is a 4G waterproof GPS Tracker with an internal battery. Embedded with Quectel module, it has superior GPS performance. ES820 also has Voice Communication capability, so it can call or send message to a preconfigured phone number. If you are looking for Usb Charging, Wireless Smart Gps Kid Tracker, Gps Kid Track Device, Smart Wireless Gps Locator and personal GPS Tracker, this is it.

ES820

gps tracker kids


âš« Tracking: It sends GPS (Location, speed) information to your application server with configurable report interval (moving or stationary).


âš« Geofence: It supports circle and polygon setting.


âš« SOS Button: Makes an SOS call or SMS message to a pre-configured phone.


âš« Mileage: Reports trip start, trip end and the mileage.


âš« 3-Axis Accelerometer: Using embedded accelerometer and carefully designed algorithm to detect the trip start/stop with accuracy.


âš« Battery Low Warning: When battery level is low, it will send low-battery alarm message.


âš« Cell-ID Based Location: Device reports cell-ID based location information if GPS signal is not available.


âš« Waterproof Case: IP65 waterproof.


âš« OTA (Over the Air): The device`s configuration, setting and firmware can be remotely upgraded.






Usb Charging,Wireless Smart Gps Kid Tracker,Gps Kid Track Device,Smart Wireless Gps Locator

esky wireless Inc , https://www.eskygpsiot.com

Posted on